D-Dome 6 System for 472 kWp plant already completely installed after 2.5 days

D-Dome 6 installation, flat roof, Freiburg, southern Germany, gravel, mounting system, frame, substructure

‘We were 50 % faster in assembling the D-Dome 6.10 rack, because the rails are pre-assembled, no longer have to be cut to size and only aligned in rows. And with the simple click mode for the peaks, a modification is very easy. As a team of four, we completely assembled the mounting system for the 472 kWp system in just 2.5 days,’ says Jachin Kopp, Managing Director of MHB Süd GmbH.

 

Installation information

  • Location: Freiburg, Germany
  • Building: manufactory ‘Black Forest milk’
  • Output: 472.5 kWp
  • Number of modules: 1,474 modules
  • Building height: 10 m
  • Built: December 2020
  • System: D-Dome 6.10
  • Roof pitch: 1°
  • Roof covering: gravel
  • Installation time: 3.5 weeks
  • Ballast (total): 3.8 tons
  • Partner: MHB Süd GmbH

Impressions of the installation

 

Step 1: Design in K2 Base

The project was designed with the planning software K2 Base. The tool provided the detailed assembly and ballasting plan including the structural analysis report.

Step 2: Installation Dome 6

The new Dome 6 flat roof system is available as a single and double-sided system, pre-assembled and, thanks to the Dome Speed Spacer, very time-saving when aligning the rails.

 

Our team would be happy to help you with the planning of your next project. Give us a call!

 