Back

Farm uses electricity from a SpeedRail System

Reference with an annual output of 165 MWh in Northern Germany
The system on the trapezoidal sheet metal roof has 1,680 solar modules on two roof surfaces and was completed in three weeks (source: Pon Power BV).

Installation information

  • Location: Weitendorf, Germany
  • Building: stable (agriculture)
  • Use of electricity: own consumption
  • Roof covering: trapezoidal sheet metal
  • Roof pitch: 20°
  • Annual output: 165 MWh
  • System: SpeedRail with SpeedClips
  • Installation time: 3 weeks
  • Number of modules: 1,680 modules
  • Module orientation: horizontal
  • Clamping of the modules: long side
  • Partner: Pon Power BV

Aerial photos of the SpeedRail System

 

Our team would be happy to help you with the planning of your next project. Give us a call!

Back

Go back

This website uses cookies to offer a better user experience for you. More