Our partner belongs to the Romande Energie group, a large electricity supplier in western Switzerland, which covers the electricity needs of 300 000 end customers. The PV system went into operation at the beginning of 2018 and has supplied large parts of the airport infrastructure.
The bitumen roof was covered with a building protection mat and a pavement slab. Using the MultiMonti screw, the SpeedRail on which the Triangle was attached to the plates. With the help of the SolidRail and the clamp, the 657 modules were mounted.
Our team will be happy to assist you with your next project. Give us a call!