All the important updates at a glance!
04.10.2019
Product of PVX Multimount® for flat roofs
26.09.2019
Demo video about the connection K2+
19.09.2019
Inverters from SMA are connected via the K2+ interface and you can now chat with the Sherpa
10.09.2019
Capture project data with the K2 App and start the design directly in K2 Base
Global climate strike on 20 September 2019
09.09.2019
Visit us at the fair in Salt Lake City at booth #2443
29.08.2019
18-20 September, Greater Noida, India
27.08.2019
From now on you can also plan the insertion system with hanger bolts or solar fasteners in Base
09.08.2019
27 to 29 August in São Paulo, Brazil
05.08.2019
The connection between the SolarEdge Designer and K2 Base is presented in the webinar
Page 7 of 23
Stay up-to-date: Subscribe to our newsletter service.
Press kit, Social Media channels and much more: Have a look on our media area.