‘Step by step, we installed the mounting systems on the large premises. We started with the 13 roofs that received the MiniRail system and the new MiniFive elevation. Then it was the turn of the hanger bolts, which support 120 modules. For the east-west elevation, we set up the D-Dome Classic System on 3 roofs and used specially planned special constructions for around 600 modules.
Due to the size and complexity of the project, planning and coordinated construction were immensely important. And since we had already successfully realised similar projects with the K2 Systems team in the past, the choice of the assembly system manufacturer was clear. With K2 Systems, you can always rely on a high level of professional and personal support,’ says Joshua Tlapak, Managing Director of MHB Montage.