{"id":59348,"date":"2023-09-22T17:03:28","date_gmt":"2023-09-22T15:03:28","guid":{"rendered":"https:\/\/k2-systems.com\/?post_type=tutorials&#038;p=59348"},"modified":"2023-09-22T17:03:28","modified_gmt":"2023-09-22T15:03:28","slug":"change-bom-export-request","status":"publish","type":"tutorials","link":"https:\/\/k2-systems.com\/en\/knowledge-training\/tutorials\/change-bom-export-request\/","title":{"rendered":"Change BOM, export and send as request"},"content":{"rendered":"<p>In this video we show how you can<strong> change the calculated article quantities<\/strong> (bill or material; BOM) for the project in <a href=\?PHPSESSID=ae82edab775f0347bedb8b6ab736871a"https:\/\/k2-systems.com\/en\/digital-services\/k2-base\/\">K2 Base<\/a> in the summary. This is often necessary if the planning data is not quite exact and you would rather be on the safe side with the material.<br \/>\nThe changed quantities are automatically marked in colour. Then we <strong>export<\/strong> the changed article list as an <strong>Excel table file<\/strong>. The same colour marking is also found in the Excel file.<\/p>\n<p>This can be sent to the <a href=\?PHPSESSID=ae82edab775f0347bedb8b6ab736871a"https:\/\/k2-systems.com\/en\/contact\/distribution-partners\/\">desired distributor<\/a> to get a quotation for the <a href=\?PHPSESSID=ae82edab775f0347bedb8b6ab736871a"https:\/\/catalogue.k2-systems.com\/\" target=\"_blank\" rel=\"noopener\">K2 articles<\/a> for the project. It can also be used to exchange information with other project partners. For example, if you are only doing the planning and not the installation.<\/p>\n","protected":false},"featured_media":0,"parent":0,"template":"","process":[3970],"topic":[3922,3923],"planning_installation":[4004],"application":[4006,4007,4008,4009,4011,4012,4013,4014,4015,4016,4010,4005],"class_list":["post-59348","tutorials","type-tutorials","status-publish","hentry","process-project-completion","topic-pitched-roof","topic-flat-roof","planning_installation-summary-bom","application-membrane","application-concrete","application-gravel-green-roof","application-bitumen-en","application-clay-concrete-tiles","application-standing-seam-metal-metal-roof-systems","application-trapezoidal-sheet-metal","application-corrugated-sheet-metal","application-sandwich-panels","application-corrugated-fibre-cement","application-pitched-roof","application-flat-roof"],"acf":[],"_links":{"self":[{"href":"https:\/\/k2-systems.com\/en\/wp-json\/wp\/v2\/tutorials\/59348","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/k2-systems.com\/en\/wp-json\/wp\/v2\/tutorials"}],"about":[{"href":"https:\/\/k2-systems.com\/en\/wp-json\/wp\/v2\/types\/tutorials"}],"wp:attachment":[{"href":"https:\/\/k2-systems.com\/en\/wp-json\/wp\/v2\/media?parent=59348"}],"wp:term":[{"taxonomy":"process","embeddable":true,"href":"https:\/\/k2-systems.com\/en\/wp-json\/wp\/v2\/process?post=59348"},{"taxonomy":"topic","embeddable":true,"href":"https:\/\/k2-systems.com\/en\/wp-json\/wp\/v2\/topic?post=59348"},{"taxonomy":"planning_installation","embeddable":true,"href":"https:\/\/k2-systems.com\/en\/wp-json\/wp\/v2\/planning_installation?post=59348"},{"taxonomy":"application","embeddable":true,"href":"https:\/\/k2-systems.com\/en\/wp-json\/wp\/v2\/application?post=59348"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}