CompanyCompany
Plan faster with K2 Base with obstacle detection: — skylights or chimneys are detected and added automaticallyMore
Mounting systemsMounting systems
TiltUp Vento System — Many different module arrangements, suitable for larger modules and 3 different ...More
Resource CenterResource Center
Unsere Neuheiten 2022 — Flexible Aufständerung mit TiltUp Vento und GreenRoof Vento Das TiltUp Ve...More
Digital servicesDigital services
Plan faster with K2 Base — with automatic obstacle detectionMore
ContactContact
Find your distributor —Well-distributed network of local distributorsMore
Menu
K2 Systems
Choose language
English
English, Australia
English, South Africa
English, United States
French
German
Italian
Portuguese, Brazil
Portuguese, Portugal
Spanish
Spanish, Mexico
Is there a guarantee on K2 mounting systems?
Where can I order K2 products?
How expensive is an assembly system?
Are there 2D or 3D files available for the products & articles?
I am an architect or planning office, who can I contact if I have any questions?
Where can I find the general building approval (abZ) or European Technical Assessment (ETA) for K2 products?
What is the rafter dimension or rafter spacing?
Does K2 have solutions for sandwich roofs?
Which system do I use on a pitched roof with bitumen roofing?
Are the rail connectors capable of carrying lightning currents or do the rails have to be connected to each other?
SolidRail System: Can horizontal modules also be installed in a single layer?
What is a cross-laminated system (2-layer system) and when is it installed?
Can a standard system be used for above-rafter insulation?
Is it possible to work with the MultiRail system in a cross system?
What is the maximum elevation (height or angle)?
Is there a minimum thickness for the sheets?
Do I have to observe the bead width at the top?
What is the minimum rafter width required?
How large may the mounting distance from the end of the rail to the module frame be?
With on-roof insulation, do the screws have to be screwed into the rafters or are they sufficient in the counter-batten?
What about the compatibility of Mat S for flat roof systems?
Which system do I use for which covering?
Single-sided elevation S-Dome or double-sided elevation D-Dome?
Edge distance on a flat roof: How do I make the best possible use of the roof area?
What is the surface load of the mounting system on the flat roof?
When do I need anti-slip protection?
Is a combination of ballasting and fixed connection possible?
How are the modules cleaned when using the roof-parallel Dome Zero system?
How many kilograms is a flat roof system weighted with or how much ballast do I need?
Can I switch off the anchor option for ballasting?