Quickly mounted: Dome 6 for 472 kWp

03/03/2021 Freiburg (Breisgau), Germany

D-Dome 6 for 472 kWp system completely assembled after only 2.5 days

“We were about 50 % faster in the assembly of the D-Dome 6.10, because the rails are completely assembled and no longer have to be cut to size, but only aligned in rows. Four of us completely assembled the mounting system for the 472 kWp system in just 2.5 days,” says Jachin Kopp, Managing Director of MHB Süd GmbH.