CompanyCompany
Our company cultureMore
ProductsProducts
The new South Face SystemMore
Project PlanningProject Planning
K2 Flash Comp KitMore
Resource CenterResource Center
ContactContact
Contact us! —Get in touch with our team for help on all your K2 projects.More
Menu
K2 Systems
Choose language
English
English, Australia
English, South Africa
English, United States
French
German
Italian
Portuguese, Portugal
Spanish
Spanish, Mexico and LATAM
Our technical sales and technical training teams are always here to support you with project planning.
What is the minimum copper wire size for bonding and grounding K2 CrossRail Systems?
What is the thermal break required in the D-Dome system?
What is the minimum distance to the roof edge in the D-Dome system?
Can we raise the CrossRail Ground Mount System 3-5 feet higher to alleviate snow cover?
Can K2 provide uplift values for PE review?
End Clamps, can they be mounted at the end of the rail, or do we need some space?
Rail connector, when we connect 2 rails how far apart does the L-foot need to be?
For the 166" rails, what is the maximum cantilever on the edges of the module?
Is the CR system compatible with larger modules?
How much weight can the ballast porter support?
Can I use the ground lug with the Shared Rail system?
Can we use the Yeti clamp in the shared systems?
Can I install a south-facing ballast project?
Does the corner strut includes bolts?
Is there a warranty on K2 mounting systems?
Can I plan a ground mounted PV system in Base?
My house does not appear on Google Maps, it is in a newly developed area. What can I do?
Why is my module not available in Base?