Project Planning

Our technical sales and technical training teams are always here to support you with project planning.

What are you looking for?

Project Planning

  • What is the minimum copper wire size for bonding and grounding K2 CrossRail Systems?

  • What is the thermal break required in the D-Dome system?

  • What is the minimum distance to the roof edge in the D-Dome system?

  • Can we raise the CrossRail Ground Mount System 3-5 feet higher to alleviate snow cover?

  • Can K2 provide uplift values for PE review?

  • End Clamps, can they be mounted at the end of the rail, or do we need some space?

  • Rail connector, when we connect 2 rails how far apart does the L-foot need to be?

  • For the 166" rails, what is the maximum cantilever on the edges of the module?

  • Is the CR system compatible with larger modules?

  • How much weight can the ballast porter support?

  • Can I use the ground lug with the Shared Rail system?

  • Can we use the Yeti clamp in the shared systems?

  • Can I install a south-facing ballast project?

  • Does the corner strut includes bolts?

  • Is there a warranty on K2 mounting systems?

  • Can I plan a ground mounted PV system in Base?

  • My house does not appear on Google Maps, it is in a newly developed area. What can I do?

  • Why is my module not available in Base?