New football stadium in Lausanne with its own PV system

16/04/2021 Lausanne, Switzerland

Construction and opening of the stadium

The video shows a time-lapse of the new stadium in Lausanne and provides insights into the construction and the opening in November 2020.

More impressions of the PV system

The fastening was done by a cross-connection of BasicRail and SingleRail.

In addition, the plant was ballasted with concrete blocks.

Share

Assembly with second rail layer Stadium SingleRail
Bad Mergentheim, Germany

Bespoke solution at German school

More
Rae vald, Harjumaa, Estonia

One building, two PV dimensions: Facade & flat roof integration in Estonia

More
Dachstein Mountain Station, Austria

K2 WallPV in a High Alpine Environment

More

SUBSCRIBE TO OUR NEWSLETTER

Stay updated: New features, updates & more

Subscribe now!
Need help?