CompanyCompany
Transparent and aligned with EU standards — Our voluntary K2 Sustainability Report follows the VSME Standard.More
Mounting systemsMounting systems
K2 GreenRoof 2.0 — Quick and flexible installation on green roofsMore
Digital ServicesDigital Services
K2 DocuApp —Paperless documentation of the entire system + extended warranty for the mounting...More
Large-scale projectsLarge-scale projects
K2 Pi-Rack — Proven K2 quality for large-scale ground-mounted systemsMore
Knowledge & Training CenterKnowledge & Training Center
KAI: The digital assistant powered by AI —Whether planning or installation: KAI provides you with smart support 24/7More
ContactContact
Find your distribution partner —Well-distributed network of local sales partners – find the right one.More
Menu
K2 Systems
Choose language
Czech
Dutch
English
English (UK)
English (USA)
English (ZA)
French
German
Italian
Polish
Portuguese
Romanian
Slovenian
Spanish
Spanish (MX + LATAM)
Installation information
Together with B&W Energy, K2 Systems planned a special substructure for a greenhouse at the beginning of the year. The special feature of this special construction was the requirement to connect the PV system to the metal scaffolding and the guttering of the greenhouse.
‘What was appealing about this project was the attachment of the mounting system to the existing metal scaffolding. For this, one of our experienced employees designed a special angle in close coordination with the photovoltaic specialists of the installer B&W Energy, which connects the scaffolding to the necessary rail and ensures an appropriate load-bearing capacity. In combination with the CrossRail 62 rail, the Climber and the Triangle triangles, a reliable and quick-to-assemble solution was created,’ summarises Rainer Ebenho, project manager at K2 Systems.
The metal frame of the greenhouse is visible.
2,499 modules were attached to it.
In addition to the CrossRail track and the triangles for special solutions, the design includes the specially developed angle.
The composition of the construction.
The PV system produces 749.7 kWp.
These are fed in completely.
Share
K2 WallPV in a High Alpine Environment
1.5 MW on several buildings of Metro Prague
K2 WallPV on a parking garage facade
SUBSCRIBE TO OUR NEWSLETTER