Your current selected languages or sales region is

EN

International (English)

Choose your language or sales region

  • EN

    International (English)

    select
  • US

    United States (English)

  • MX

    Mexico (Spanish)

  • AU

    Australia (English)

  • DE

    German

  • FR

    French

  • IT

    Italian

  • ES

    Spanish

  • PT

    Portugal

Quickly mounted: Dome 6 for 472 kWp

03/03/2021 Freiburg (Breisgau), Germany

D-Dome 6 for 472 kWp system completely assembled after only 2.5 days

“We were about 50 % faster in the assembly of the D-Dome 6.10, because the rails are completely assembled and no longer have to be cut to size, but only aligned in rows. Four of us completely assembled the mounting system for the 472 kWp system in just 2.5 days,” says Jachin Kopp, Managing Director of MHB Süd GmbH.

Impressions of the installation

Share

Flat roof Commercial Flat roof D-Dome 6.10 Xpress Dome 6 Gravel Flat roof Commercial
Ainring, Germany

5° roof tilt, 100% ballast – thanks to K2 RidgeConnector

More
Hamburg, Germany

The World’s First PV System in Rainbow Colors

More
K2 Systems Referenz Fassade Elpo

Artful Integration: PV Modules in Dialogue with the Landscape

More

SUBSCRIBE TO OUR NEWSLETTER

Stay updated: New features, updates & more

Subscribe now!