Quickly mounted: Dome 6 for 472 kWp

03/03/2021 Freiburg (Breisgau), Germany

D-Dome 6 for 472 kWp system completely assembled after only 2.5 days

“We were about 50 % faster in the assembly of the D-Dome 6.10, because the rails are completely assembled and no longer have to be cut to size, but only aligned in rows. Four of us completely assembled the mounting system for the 472 kWp system in just 2.5 days,” says Jachin Kopp, Managing Director of MHB Süd GmbH.

Impressions of the installation

Share

Flat roof Commercial Flat roof D-Dome 6.10 Xpress Dome 6 Gravel Flat roof Commercial
Vienna, Austria

Vienna City Hall features K2 SolidRail

More
Neustadt an der Donau, Germany

K2 Carport System at Atlas Copco

More
Ferrowohlen, Switzerland

Largest rooftop PV system in Switzerland

More

SUBSCRIBE TO OUR NEWSLETTER

Stay updated: New features, updates & more

Subscribe now!