Quickly mounted: Dome 6 for 472 kWp

03/03/2021 Freiburg (Breisgau), Germany

D-Dome 6 for 472 kWp system completely assembled after only 2.5 days

“We were about 50 % faster in the assembly of the D-Dome 6.10, because the rails are completely assembled and no longer have to be cut to size, but only aligned in rows. Four of us completely assembled the mounting system for the 472 kWp system in just 2.5 days,” says Jachin Kopp, Managing Director of MHB Süd GmbH.

Impressions of the installation

Share

Flat roof Commercial Flat roof D-Dome 6.10 Xpress Dome 6 Gravel Flat roof Commercial
26/01/2023 Herrenberg, Germany

PV system with SingleRail and CrossHook 3S supplies single-family home with electricity and feeds into the grid

SingleRail CrossHook 3S Pan tile Residential house Consumption Feed Herrenberg
More
11/11/2022 Weiden, Germany

Bavarian bakery uses its own solar power from a 750 kWp system

SolidRail Sheet metal seam clamp Zambelli RibRoof 465 Commerce Standing seam
More
11/07/2022 Colmar-Berg, Luxembourg

Solar plant with 1.3 MWp has 4,162 modules, 6 km of mounting rails and 17 inverters

D-Dome Classic Flat roof Commercial Cooperative
More

SUBSCRIBE TO OUR NEWSLETTER

Get tips and news on solar energy