Quickly mounted: Dome 6 for 472 kWp

03/03/2021 Freiburg (Breisgau), Germany

D-Dome 6 for 472 kWp system completely assembled after only 2.5 days

“We were about 50 % faster in the assembly of the D-Dome 6.10, because the rails are completely assembled and no longer have to be cut to size, but only aligned in rows. Four of us completely assembled the mounting system for the 472 kWp system in just 2.5 days,” says Jachin Kopp, Managing Director of MHB Süd GmbH.

Impressions of the installation

Share

Flat roof Commercial Flat roof D-Dome 6.10 Xpress Dome 6 Gravel Flat roof Commercial
09/01/2023 Stredočeský kraj, Czech Republic

Going vertical: Bespoke facade solution in Czech Republic

More
02/10/2023

Power in the building meets power on the roof: Bespoke solution on school gym in Muttenz (CH)

More
Esslingen, Germany

Connecting “the Länd”: D-Dome 6.10 on EnBW properties

More

SUBSCRIBE TO OUR NEWSLETTER

Get tips and news on solar energy