CompanyCompany
High quality standards — A secure connection with the highest quality More
Mounting systemsMounting systems
K2 GreenRoof Vento — Can soon be planned in K2 Base!More
Digital ServicesDigital Services
K2 Buddy — Ensuring the safety of PV systems in snowy regions with K2 BuddyMore
Resource CenterResource Center
Want to learn more? — Live webinars, clear tutorials and numerous trainings for more know-howMore
ContactContact
Find your distributor — Well-distributed network of local distributors - find the right one.More
Menu
K2 Systems
Choose language
English
English (Australia)
English (South Africa)
English (United States)
French
German
Italian
Portuguese (Brazil)
Portuguese (Portugal)
Spanish
Spanish (Mexico)
Fast and accurate planning of K2 mounting systems for pitched and flat roofs. We show how it's done.
Can projects with frameless modules also be planned in Base?
What is Base and how does it work?
Can I register with K2 Base as a private individual?
Do I have to pay to use Base?
How can I register with K2 Base?
I have registered and cannot use Base yet. What is the reason for this?
I registered, but I get an error message when I try to log in. What should I do?
I've forgotten my password. What should I do?
The map view in the "Roof" section is different than in the "Project" section. Why is that?
How can I deposit my module in Base?
Why is my module not in Base?
Is it possible to enter or create module data yourself?
I get a message that my project is overloaded. Where can I check which part has been overloaded?
Base calculates more modules than roof size. How can that be?
The roof dimensions in the satellite view differ from the dimensions in the 2D view. Which view is correct?
Why can I no longer change my project data?
My house does not appear on Google Maps, it is in a new development area. What can I do?
I am shown imperial & in feet instead of metric & metres. How can I change the unit of measurement?
I get the error message 422. What is the reason for this?
How do I transfer my data to other planning tools via K2+: PVSol, archeliospro, Kostal, GoodWe, SolarEdge, SMA, Fronius
What are the statuses for my project?
I see a white border around my building. How can I add to or extend my map or satellite image?
K2 Base hangs, what can I do?
How can I enter the values for the loads manually or change them manually?
Can I plan a ground-mounted PV system in Base?
From how many modules do I need a thermal break?
I get the error message 502, what can I do?
I have transferred my project from PV Sol to K2 Base and would like to change my project data afterwards (e.g. location, name).
Can I plan a facade system in Base?
How to read the base report (PDF), is there a description?
How can I upload images or PDFs to Base to be able to plan on these templates?
How can I check that I have planned my project correctly?
I can no longer find an older project. Has it been deleted?
What does the yellow dot in the base in the summary mean?
Why don't I see any projects? Are my projects deleted?
Projects are missing. What should I do if I don't see all my colleagues' projects?
I want to copy a project and use it as a template. How does it work?
I would like to download all my base projects at once. Is that possible?
What does the white arrow in the roof tab mean and how should it be aligned?
Can I upload my own image instead of GoogleMaps, for example from a drone etc.?
How can the dimensions between the edge of the roof and an obstacle be entered?
Does Base have automatic obstacle detection?
Where do I see my colleagues' projects?
How can I edit or delete my colleagues' projects?
How do I share my projects with people outside my company?
How can I download my project file (k2o) and send it to K2, for example?
How to plan a pitched roof with bitumen roofing?
Can a cross bond or 2-layer rails be planned in Base?
How can I insert the SingleBoard (formerly Crossboard) into Base?
How do I plan a dome system with elevation on trapezoidal sheet metal?
What do I do with a cantilever and a rail that is overloaded on one side?
How large can the cantilever arm be?
How do I plan sheet metal tiles or metal roof tiles in K2 Base?
Does the use of sheet metal tiles affect the K2 Base layout?
I have changed the arrangement of the roof hooks or mounted them offset to the K2 Base specifications. Can I still build this?
How do I take the counter battens into account when planning?
How do I plan the horizontal and vertical installation on a roof surface?
If I have on-roof insulation, are screws in the counter battens sufficient or do they have to go into the rafters?
How is the edge distance to the roof edge defined?
How to read the structural analysis report for flat roof systems in the K2 Base PDF Report?
How can I combine S-Dome and D-Dome systems on one roof?
What is the yellow line? Why do I have to keep an edge distance? (Flat roof)
My flat roof has different slopes. How can I plan the slope structure in K2 Base?
When is GreenRoof Vento coming to K2 Base?
How can I align the modules vertically or upright with the Dome system?
Can I reduce the edge distances or set them to 0?
Where can I plan fall protection in K2 Base?
How can I place individual modules at the end of a row, especially in the D-Dome system?
How do I optimise ballast?
The parapet has a different height. Which height do I enter for K2 Base?
To what extent do obstacles influence the ballasting?
Why is the ballasting at K2 relatively low compared to other mounting system manufacturers?
Can the modules in Base be rotated by more than 15 degrees and if so, how?
From how many degrees of roof pitch should separate roof areas be installed on a flat roof?
Up to how many degrees of roof pitch is a roof considered a flat roof in the base?
Are elevation systems also displayed for flat roofs or up to what inclination are they displayed?
Why are some ballast values highlighted in red in K2 Base?