New football stadium in Lausanne with its own PV system

16/04/2021 Lausanne, Switzerland

Construction and opening of the stadium

The video shows a time-lapse of the new stadium in Lausanne and provides insights into the construction and the opening in November 2020.

More impressions of the PV system

The fastening was done by a cross-connection of BasicRail and SingleRail.

In addition, the plant was ballasted with concrete blocks.

Share

Assembly with second rail layer Stadium SingleRail
Göppingen, Germany

Custom solution on a parking garage façade

More
8101 Gratkorn, AT

K2 WallPV MultiRail on silo façades

More
Szeged, Hungary

K2 WallPV MultiRail System in Hungary

More

SUBSCRIBE TO OUR NEWSLETTER

Stay updated: New features, updates & more

Subscribe now!